Friday 22 09 2023 07:02:47 AM

Office Address

123/A, Miranda City Likaoli Prikano, Dope

Phone Number

+0989 7876 9865 9

+(090) 8765 86543 85

Email Address

info@example.com

example.mail@hum.com

Scrubber barge will capture, treat exhaust from ships in LA, Long Beach ports
Dr.G.R.Balakrishnan May 31 2022 Container Terminal News

Scrubber barge will capture, treat exhaust from ships in LA, Long Beach ports

Clean Air Engineering – Maritime (CAE-M), based in San Pedro, California, will operate a barge with an exhaust after treatment system, the Marine Exhaust Treatment System (METS-3), at the ports of Long Beach and Los Angeles.

CAE-M systems remove diesel emissions from the auxiliary engines and boilers of oceangoing vessels while at berth or at anchor.

The 26-metre-long, 13-metre-wide ship is designed by Fassmer Technical Projects and currently under construction at the US shipyard Greenbrier Companies in Portland.

The ship’s main propulsion system consists of two electrically powered SCHOTTEL rudder propellers that operate with biodegradable oils.