Wednesday, 25 November 2026, 07:22:41 PM
BREAKING NEWS
Softlink Global Integrates Logi-Sys with ‘Bharat Connect for Business’, Bringing Logistics Invoicing and Payments onto a Unified Platform Keeping Seafarers Fit for Duty: How Specialised Healthcare is Addressing Occupational Health Risks at Sea- Article by Ms. Suhasini Deshmukh, Director, MedRabbits Healthcare & Clinic Nord Gas Solutions selected to supply cargo handling and fuel gas supply systems for two Very Large Gas Carriers NextWave Seafarers: global partners come together to open doors to careers at sea LAUNCH: Review of Maritime Transport 2026 - Shipping at a Crossroads EU targets shadow fleet and Russian-insured tankers in new sanctions package DGMA implements revised IMO Guidelines for enclosed space entry aboard ships to strengthen seafarer safety US Coast Guard warns ore-laden bulker could capsize in Majuro lagoon/ Black Sea gas project set to lift Romania's economic output in 2027/ India’s $100-billion textile export ambition hinges on manufacturing scale and reliable supply chains Softlink Global Integrates Logi-Sys with ‘Bharat Connect for Business’, Bringing Logistics Invoicing and Payments onto a Unified Platform Keeping Seafarers Fit for Duty: How Specialised Healthcare is Addressing Occupational Health Risks at Sea- Article by Ms. Suhasini Deshmukh, Director, MedRabbits Healthcare & Clinic Nord Gas Solutions selected to supply cargo handling and fuel gas supply systems for two Very Large Gas Carriers NextWave Seafarers: global partners come together to open doors to careers at sea LAUNCH: Review of Maritime Transport 2026 - Shipping at a Crossroads EU targets shadow fleet and Russian-insured tankers in new sanctions package DGMA implements revised IMO Guidelines for enclosed space entry aboard ships to strengthen seafarer safety US Coast Guard warns ore-laden bulker could capsize in Majuro lagoon/ Black Sea gas project set to lift Romania's economic output in 2027/ India’s $100-billion textile export ambition hinges on manufacturing scale and reliable supply chains
North Carolina lock and dam faces emergency repairs after erosion
Cape Fear River Lock and Dam No. 1 in North Carolinas ACE River currents have cut a channel under the full length of the North Carolina lock chamber. Wilmington District expects stabilisation work to take 30 days once underway.

North Carolina lock and dam faces emergency repairs after erosion

The US Army Corps of Engineers (USACE) Wilmington District will carry out emergency repairs at Cape Fear River Lock and Dam No. 1 in North Carolina. Inspectors found that river currents had eroded a channel through the riverbed beneath the structure.     The district said on October 30 that the channel runs from a point above the upper lock gates, under the full lock chamber, and out below the lower gates.     "If left unaddressed, continued erosion could undermine the riverbed supporting the structure, potentially causing settling or structural damage," the district said.     A specialised internal maintenance and repair unit is assisting USACE in devising a plan to stabilise the affected area and prevent further erosion.    The repairs are expected to be completed within 30 days of work getting underway. The district will then assess whether further work is needed to permanently stabilise the structure.     River levels are expected to remain within normal operating ranges during the work. Residents and visitors near the project area have been asked to observe posted signage and comply with access restrictions.     The lock is not currently passing vessels. Separately, the Marietta, Ohio-based Regional Rivers Repair Fleet is rehabilitating the Cape Fear River locks and dams under the fiscal year 2022 Infrastructure Investment and Jobs Act.   

 Lock and Dam No. 1 is located at Kings Bluff, about 39 miles (63 kilometres) upriver from Wilmington. The lock was built in 1915 and modified in 1934. It has a 40-by-200-foot (12.2-by-61-metre) chamber and an 11-foot lift.

Search Sagar Sandesh